ElaraSilk logo
ElaraSilk
Custom silk scarves, pillowcases, sleep masks, scrunchies and pajamas

Custom Silk Products Manufacturer for Brands

ElaraSilk makes custom silk products for brands and B2B buyers at its own factory in Hangzhou.

  • ✓ MOQ: 10 pieces per design
  • ✓ Standard samples: 5–7 days
  • ✓ Self-owned factory in Hangzhou

Choose What You Want to Develop

Start with a finished product, silk fabric or printing service. Each route has different details to confirm before sampling.

Scarves & Ties

Set the size, silk, artwork, edge finish or tie construction.

Pillowcases & Sleep Masks

Compare momme, pillowcase openings, mask straps, filling and packaging.

Scrunchies & Bonnets

Choose the size, elastic or band, layers and set packing.

Pajamas & Robes

Define the style, fit, trims, embroidery and labels.

Silk Fabrics

Select the weave, momme, width, color and finish.

Fabric Printing

Confirm the base silk, artwork scale, repeat or placement, color references and print sample.

Build the Specification Before the Sample

A useful brief connects three decisions.

Printed scarf as a finished custom silk product

Product

Size or fit, construction and intended use.

Custom Products
Close-up of pink silk satin surface

Surface

Weave, momme, dye, print and embroidery.

Silk Fabrics
Printed sleep mask with matching drawstring pouch

Brand

Logo position, labels, packaging and market requirements.

Discuss Your Brief
Digital printing equipment producing custom printed fabric

Production You Can Place on a Map

Factory operations began in 2008. ElaraSilk opened its current self-owned 3,600 m² Hangzhou facility in 2025. The team has 48 employees, including 38 production staff, with stated monthly capacity of 8,000–10,000 pieces. Capacity is a planning figure, not the same delivery promise for every order.

Four Checks Before Bulk Production

Keep one approved specification from brief to packing.

Send requirements

1. Brief

Product, use, quantity, market and target date.

Review and quote

2. Specification

Material, construction, artwork, labels and packaging.

Sample approval

3. Sample

Normally 5–7 days after the required inputs are confirmed.

Production and delivery

4. Bulk

Normally 15–20 days after approval; the final plan depends on the order.

Silk fabric swatches in multiple colors

Choose Silk for the Product, Not by Name Alone

Momme describes fabric weight. Weave changes the surface, drape and structure.

  • Material: 100% mulberry silk.
  • Momme: Confirmed 16, 19, 22, 25 and 30 momme options.
  • Weave: Charmeuse, crepe de chine, habotai, satin, twill and silk chiffon directions.
  • Artwork and color: Scale, placement, repeat, reference and print result.
  • Labels: Logo position, labels and market requirements belong in the project specification.
  • Packaging: Folding and packaging fit are confirmed with the finished product.
Assorted silk scarves, ties, sleep accessories, pillowcases and pajamas arranged together
Check the Document, Not Just the Logo
Adjustable and elastic sleep mask strap options

Fit and Construction

Size, opening, strap, edge, elastic or garment fit.

View Product Options
Front and back artwork placement file for a printed garment

Artwork and Color

Scale, placement, repeat, reference and print result.

Review Printing Options
Silk sleep mask presented in a custom gift box

Brand Presentation

Embroidery, labels, folding and packaging fit.

Discuss Your Brief
Digital printing, sewing and finished-product packing processes

Core Work Stays In-House

One factory record connects the approved sample to production. The exact inspection points still follow the product and approved specification.

  • Surface
    Dyeing, digital printing, screen printing and embroidery.
  • Make
    Hand rolling, cutting, sewing and ironing.
  • Release
    Quality checks and packaging.

Send a Brief We Can Review

Include the product, preferred silk, size or fit, artwork, quantity per design, labels, packaging and target date. Email info@elarasilk.com or use WhatsApp at +86 180 5687 8656.

Start a Custom Silk Inquiry
10 pieces
Standard MOQ per design
5–7 days
Standard sample timing
15–20 days
Standard bulk production

First Questions from New Buyers

Short answers about order entry, timing, factory operations and the first project brief.

Standard finished-product orders start at 10 pieces per design. Fabric, printing and special packaging can use different order units.
Standard samples normally take 5–7 days. Standard bulk production normally takes 15–20 days after approval. The final plan follows the confirmed order.
Yes. The current self-owned 3,600 m² facility is in Hangzhou and opened in 2025; factory operations began in 2008.
Start with product, material, size or fit, artwork, quantity, branding, packaging and target date. Open decisions can be marked for review.
No. The site is for brands and buying teams developing custom products, fabric or printing for sampling and bulk production.
WhatsApp Chat with us